Heat pump planning permission: the MCS 020 rule explained

Most air source heat pumps in England are installed under permitted development, so no planning application is needed. But that right is conditional: the installation must comply with the MCS 020a planning standard, and from 29 May 2026 MCS 020a has been the only certification route accepted (the old wording covered jobs up to the end of 28 May 2026; sources: planningportal.co.uk; SI 2025/560, article 7).

Get help Read the guide

On this page
  1. What MCS 020a actually is
  2. What changed after 28 May 2026
  3. When you still need a full planning application
  4. What to ask before booking
  5. The permitted development limits (Class G, England)
  6. Questions people ask

What MCS 020a actually is

It's the Microgeneration Certification Scheme's planning standard for permitted development heat pump installations. Your installer completes a sound calculation against it to show the unit meets the noise condition attached to the permitted development right (source: planningportal.co.uk).

What changed after 28 May 2026

Up to the end of 28 May 2026, installers had more than one route to demonstrate compliance. From 29 May 2026, MCS 020a has been the only certification scheme accepted for permitted development heat pump installations in England (sources: planningportal.co.uk; SI 2025/560, article 7). If you're only now getting quotes, ask the installer to confirm their calculation is on the current standard, not an older one.

When you still need a full planning application

If the installer's MCS 020a sound calculation shows the unit would be too loud at a neighbour's nearest door or window, or the job breaks one of the limits in the table below, permitted development doesn't apply and you need a planning application instead. That's a site-specific outcome, worth asking about before you commit to a quote, not after.

What to ask before booking

Ask whether the quote includes the MCS 020a sound calculation, and ask to see the result before installation, not after. It's the document that protects you if a neighbour later queries the noise, and it's the test for whether permitted development genuinely applies to your installation.

The permitted development limits (Class G, England)

A heat pump only goes in without a planning application if it meets all of these, as well as MCS 020a. Sources: the Planning Portal and SI 2025/560 (with its explanatory memorandum), checked 1 November 2026.

Air source heat pump permitted development limits in England
Rule The limit
Size of the outdoor unit The outdoor compressor unit, including its housing, must be no bigger than 1.5 cubic metres on a house, or 0.6 cubic metres on a block of flats. (Planning Portal)
How many units One on a house that is not detached, or on a block of flats. Up to two on a detached house. More than that, or a unit where there is already a wind turbine, needs a planning application. (Planning Portal)
Distance from the boundary The old rule that no part of the unit could sit within 1 metre of the boundary was removed from 29 May 2025. The MCS 020a noise limit still applies, measured 1 metre outside a neighbour's door or window to a lived-in room. (SI 2025/560)
Roofs Not on a pitched roof. On a flat roof, every part of the unit must be at least 1 metre from the outside edge of the roof. (Planning Portal)
Listed buildings Permitted development does not apply anywhere within the grounds of a listed building, or on a scheduled monument site. (Planning Portal)
Conservation areas and World Heritage Sites Not on a wall or roof that faces a road, and not nearer to a road that borders the property than any part of the building. (Planning Portal)
Everywhere else Not on a wall that faces a road if any part of it is above ground floor level. (Planning Portal)
Heating and cooling The unit can heat, or heat and cool, but not only cool. This let air-to-air heat pumps use permitted development from 29 May 2025. (SI 2025/560)
Your council can still say no A planning condition or an Article 4 Direction on your property can remove permitted development rights. (Planning Portal)

On the date: the Planning Portal says MCS 020a is the only accepted scheme from 28 May 2026. The law (SI 2025/560, article 7) let jobs under the old "or equivalent standards" wording go ahead until the end of 28 May 2026.

For cost and how to check an installer's wider certification, see our guides to air source heat pump cost and finding an MCS-certified installer.

Questions people ask

Do I need planning permission for a heat pump?

Usually not. Most air source heat pump installations in England fall under permitted development, so no application is needed. The exception is where the installer can't meet the MCS 020a planning standard for your specific property, in which case a full application is needed instead.

What changed after 28 May 2026?

From 29 May 2026, MCS 020a has been the only certification scheme accepted for permitted development heat pump installations in England. The alternative routes installers could previously use to demonstrate compliance could be used up to the end of 28 May 2026 (sources: planningportal.co.uk; SI 2025/560, article 7).

Who is responsible for the MCS 020a calculation, me or the installer?

The installer produces the sound calculation as part of the job. Ask to see it before the installation goes ahead, both to confirm permitted development genuinely applies and to have the record on file.

Sourced from Planning Portal: planning permission for an air source heat pump and The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2025 (SI 2025/560). See our data sources and updates page.

Keep reading

Related on VettedHome

Adam Parker

Adam Parker

Editor, VettedHome

Adam leads VettedHome's editorial coverage of UK home services. He is the founder and managing director of Muswell Rose, the commercial strategy and modern systems business behind a portfolio of UK information sites, and he researches and writes the plain-English guides that help homeowners choose between installers and trades, drawing on the standards set by the relevant bodies for each job, such as Gas Safe Register, NICEIC, MCS, TrustMark and the Property Care Association. He is clear about what to check before any work starts.

Last updated:

Get help

Where are you with a heat pump?

Tell us what’s happening and we’ll get back to you with the next step. Free to use.

Get help

Free to use · Nobody pays to be listed · We tell you who gets your details